Long Before Simpol, Cooking Was Already Personal

At the heart of it, Chef Tatung’s approach reminds people that cooking is a human experience shaped by stories, relationships, and the simple act of caring.

The Birth Of The KitchiZen: Slow Fire, Steady Heart In A World Of Too Much

With KitchiZen, Chef Tatung invites reflection on how simple acts, repeated over time, can shape a more balanced and grounded way of living.

Taiwan Taps Filipino Talent For Global Semiconductor Workforce At 2026 Career Day

Taiwan brings semiconductor career opportunities to Manila, connecting Filipino engineers with global industry leaders as demand for skilled talent continues to rise.

When Publicity Stopped Being Proof Of Reputation Strength

Modern reputation management requires more than visibility, as stakeholders now rely on evidence from actions, culture, and engagement rather than curated public communications.

DPWH Completes 2nd Phase Of Road Leading To Samar’s Hidden Falls

The Department of Public Works and Highways completes second phase of the Pinipisakan Falls access road, making the hidden gem in San Jorge, Samar more accessible to tourists.


DPWH Completes 2nd Phase Of Road Leading To Samar’s Hidden Falls

105
105

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Public Works and Highways has completed the second phase of the construction of an access road that leads to the hidden Pinipisakan Falls in San Jorge, Samar.

Funded under the 2023 Tourism Road Infrastructure Program (TRIP), the PHP48.95 million road project will make the waterfalls accessible to tourists, DPWH-Samar 1st District Engineering Office chief Raulito Yangzon said in a phone interview Wednesday.

The construction began in February and was completed last week.

Yangzon said the second phase project covers the construction of a road that is 800 meters in length and 6.1 meters wide, as well as the paving of the road shoulders.

The DPWH also installed seven meters of reinforced concrete pipe culverts and built a 45-meter slope protection.

In 2022, the DPWH completed the PHP4.65 million first phase of the road project, also funded by TRIP. The project covered the paving of 546 meters of a two-lane road.

Yangzon said he is still unsure how many more phases would be needed to complete the entire 9.9-km. road stretch from Blanca Aurora to Bay-ang villages as work depends on budget allotment from the national government.

The first two phases of the multi-year project have just opened and concreted 1.34 km. of road.

Before the road pavement, Pinipisakan Falls could only be reached through a three-hour motorboat ride and hiking.

Pinipisakan is a four-tiered waterfall cascading down from a cave in the forest deep in the jungles of San Jorge, Samar. (PNA)