Accelerating The Net Zero Journey: Nestlé PH Brings Together Industry Partners To Share Best Practices In Sustainability

Nestlé Philippines brings industry partners together to advance sustainability, highlighting how collaboration strengthens the path toward net zero emissions.

Vivant Diversifies Portfolio With Launch Of Water Distribution Venture In Bantayan, Cebu

Vivant expands beyond energy with a strategic move into water distribution, strengthening its role in essential services and long-term sustainability in Bantayan, Cebu.

Sustainability As Reputation Infrastructure

Regulations in the Philippines now mandate structured sustainability disclosures, reinforcing the shift from voluntary initiatives to audited institutional requirements.

How Chef Tatung Learned To Let Simpol Grow Beyond Him

Behind Simpol’s familiar tone is a deliberate process, where discipline and shared understanding help transform simple content into something that resonates across platforms and audiences.

SMC, DPWH Open Skyway Stage 3 Quirino Southbound Exit

SM Corp. has opened the southbound Quirino exit of the Skyway Stage 3 elevated expressway to Class-1 vehicles, allowing motorists coming from Balintawak and Quezon Ave. to directly reach Manila within less than 20 minutes without traffic.

SMC, DPWH Open Skyway Stage 3 Quirino Southbound Exit

103
103

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

San Miguel Corporation (SMC), through SMC Infrastructure, opened the southbound Quirino exit of the Skyway Stage 3 elevated expressway to Class-1 vehicles, allowing motorists coming from Balintawak and Quezon Ave. to directly reach Manila within less than 20 minutes from 1.5 hours without traffic.

The opening was led by SMC president Ramon S. Ang and Department of Public Works and Highways (DPWH) secretary Mark Villar.

“The full completion of Skyway Stage 3 will divert at least 75,000 vehicles away from EDSA or C5. This is a realization of President Duterte’s promise to decongest EDSA. Skyway Stage 3 is proof that the private sector and the government can work together towards a unified solution,” Villar said.

Ang, for his part, said: “The opening of the Quirino southbound exit will greatly improve accessibility from Quezon City and Manila. With more private vehicles diverted to Skyway Stage 3 on their way back from NLEX, or coming from Quezon Ave., to Manila, traffic on our major public roads as well as on streets usually utilized as ‘short cuts’ or ‘alternate routes’, will be a thing of the past. This will redound to relief from congestion and faster and easier commutes for many of our countrymen on our major thoroughfares. We thank President Duterte and the government team led by Secretary Villar for all their support.”

And said SMC will continue to deliver on its commitment to bring motorists quality infrastructure that addresses congestion and lack of accessibility.

“We remain dedicated to providing convenient and seamless travel for motorists to help decongest Metro Manila and enable growth in all areas that we reach,” he added.

SMC, which fully-funded and built 100% of the Skyway Stage 3, said the expressway now has 15 operational ramps. These include:

 

Northbound Entry/On-Ramps:

• Buendia (Zobel)

• Quezon Avenue

 

Southbound Entry/On-Ramps:

• Balintawak

• Quezon Avenue

• Plaza Dilao

 

Northbound Exit/Off-Ramps:

• Quirino Avenue

• Nagtahan

• Quezon Avenue

• A. Bonifacio

• Balintawak

 

Southbound Exit/Off-Ramps:

• Quezon Avenue

• E. Rodriguez

• Nagtahan

• Quirino

• Buendia (Zobel)

The Skyway Stage 3, formally opened on January 2021, connects Buendia to Balintawak, and vice versa. Together with Skyway 1 and 2, the Skyway system is a 38-kilometer elevated expressway with 36 on- and off-ramp access points that greatly improves accessibility, transportation, and traffic conditions throughout Metro Manila.