Oman–Philippines 3: Strategic Majlis Opens In Manila To Build On Decades Of Migration Ties Through Trade And Investment

Oman and the Philippines are building on people-to-people connections to strengthen cooperation in investment, commerce, and shared growth.

A Winning Journey: From HONOR 600 To Mercedes-Benz EQA

HONOR Philippines turns a promo journey into a winning moment as one fan drives home a brand-new Mercedes-Benz EQA.

Oman To Join Philippine-Hosted Ministerial Meeting Marking 50 Years Of The Treaty Of Amity And Cooperation In Southeast Asia

The Philippine-hosted gathering offers Oman a chance to strengthen political and economic partnerships with Southeast Asian partners.

Deloitte Highlights Resilient Southeast Asia IPO Market In First Half Of 2026

Deloitte reports that Southeast Asia raised USD 3.07 billion from 47 IPOs, reflecting stronger fundraising despite an 11 percent decline in listings.

New Energy Systems Launched Ensuring Supply During Calamities

President Marcos Jr. is happy about the launch of the new Energy Sector Emergency Operations Center and Mobile Energy System. These initiatives will make the country's energy systems stronger, ensuring we have power even during disasters.

New Energy Systems Launched Ensuring Supply During Calamities

1,488
1,488

How do you feel about this story?

Express Your Reaction
Like
Love
Haha
Wow
Sad
Angry

President Ferdinand R. Marcos Jr. on Monday expressed elation over the launching of the new Energy Sector Emergency Operations Center (ESEOC) and the Mobile Energy System (MES), which would strengthen the resilience of the country’s energy systems and ensure power supply in times of calamities.

During the launching of the ESEOC and MES at the Energy Center in Bonifacio Global City, Taguig City, Marcos emphasized the importance of reliable power supply during emergency situations.

“Electricity makes relief, response, and reconstruction possible. We know from bitter experience that power delayed, is not only rehabilitation deferred, but also development denied. Without power, hospitals cannot treat the injured, food is spoiled, and communications is cut off,” Marcos said in his message read by Executive Secretary Lucas Bersamin.

“For people and places devastated by disasters, nothing conveys the assurance that everything will be alright than the availability of power,” he added.

“We cannot count on people’s resilience alone. People’s patience is not a renewable resource, we must put in place contingencies,” the President stressed.

Marcos said the ESEOC would allow the government to conduct near real-time monitoring of energy infrastructures such as the grid performance and distribution network, especially during disasters when power service is at risk.

It will also serve as a centralized hub for collaboration and information sharing across the entire energy supply chain to ensure seamless coordination among local, regional, and national authorities in times of crises, he added.

Meanwhile, the MES, a portable and flexible energy system that taps into a renewable energy source, may be used to improve energy access in remote communities.

The President said the government would deploy the initial MES units to typhoon-prone municipalities of Santa Ana and Lal-lo in the province of Cagayan, as well as to various government agencies.

He also thanked the United States Agency for International Development (USAID) and the Department of Energy (DOE) for partnering in coming up with innovative and sustainable energy projects.

The projects form part of USAID’s five-year, PHP1.6-billion (USD34 million) “Energy Secure Philippines” (ESP) flagship project, which aims to foster a more competitive, secure, and resilient energy sector in the country.

“These projects show the power of unity and the value of cooperation,” he said.

The USAID turned over during the ceremony eight solar-powered MES units to the DOE, of which, two will be stationed at the DOE, one will be used as backup power for the ESEOC, while the rest will be deployed between June and August of this year.

According to the DOE, each MES unit, amounting to PHP2.99 million to PHP5.25 million, has 50 kWh battery storage and, upon full charging, can power two television sets, two air-conditioning units, 10 lightbulbs, two desktop computers, two laptops, five phone chargers, five electric fans, and one modem for almost 12 hours. (PNA)

Express Your Reaction
Like
Love
Haha
Wow
Sad
Angry