Balintawak To EDSA: How Your LRT-1 Commute Retraces The Story Of Philippine Freedom

An LRT-1 ride from Balintawak to EDSA becomes more than a commute when it traces echoes of Philippine freedom.

Tala Highlights Role Of Real-Time Data In Reshaping SME Lending At Money20/20 Asia

Tala’s Money20/20 Asia discussion highlights how real-time data can help reshape SME lending with faster and more informed decisions.

How Michelle Enriquez Turned A Search For Home Into DIY Travel Philippines

Michelle Enriquez turned a personal search for Filipino roots into DIY Travel Philippines, a community helping travelers explore the country with confidence.

How One Man’s Fight For Survival Shaped Asia’s Largest Dialysis Network

Asia’s largest dialysis network began with one man’s fight to survive and grew into a mission shaped by human need.

MRT-3 ‘Libreng Sakay’ Ridership Reaches 18-M In First 2 Months

The Metro Rail Transit Line 3 has recorded more than 18 million free rides during the first two months of its "Libreng Sakay" program since the end of March.

MRT-3 ‘Libreng Sakay’ Ridership Reaches 18-M In First 2 Months

78
78

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Metro Rail Transit Line 3 (MRT-3) has given more than 18 million free rides during the first two months of its “Libreng Sakay” (free ride) program since the end of March.

A total of 18,069,523 ridership was recorded from March 28 to May 31, the MRT-3 said Wednesday.

During the first month of the program, it recorded a ridership of 8,472,637, compared to 9,596,886 in its second month.

“These numbers are expected to grow as the program was extended anew for the third straight month, until 30 June 2022,” its Facebook post read.

During weekdays, the rail line averaged a daily ridership of 309,013 during the program’s first month, which later increased to an average of 343,580 in its second month.

From March 28 to May 30, its weekday ridership had consistently been higher than 350,000, with the highest single-day ridership reaching 366,994 on May 27.

“This was the highest ridership registered since the MRT-3 went back to operations in June 2020. Throughout the implementation of the ‘libreng sakay’, the MRT-3 recorded zero unloading incidents,” the MRT-3 said.

The program aims to help passengers with their daily expenses amid rising fuel prices and other goods and to showcase the improved services and facilities of the newly rehabilitated MRT-3.

“The program also gives way for the management to further test the performance of the rail line, specifically in accommodating up to or more than 350,000 passengers daily,” it said.

The MRT-3 completed its massive rehabilitation in December last year, which included the upgrade of its tracks, signaling and communications, power and overhead catenary system, rolling stock, and depot and station equipment. (PNA)