Limited Time Offer: Save PHP1,000 On HONOR 90 Lite 5G + Free Bluetooth Speaker!

The HONOR 90 Lite 5G is now available at a discounted price – it's the perfect time to upgrade your phone!

Elevate AIDA: Empowering Women With Digital Skills Training

Elevate AIDA, Aboitiz, and Connected Women are teaming up to empower women through tools and training for meaningful employment.

The World’s No. 1 AI Camera Phone: HONOR Magic6 Pro Is Confirmed To Arrive In PH!

Experience magic this May with the multi-awarded HONOR Magic6 Pro, an AI camera phone with 5 DXOMARK Top 1 Labels!

Tala, Maya Bank Announce Loan Channeling Partnership Towards Financial Inclusion In PH

Tala, the first fintech company for the Global Majority, announced its team-up with Maya Bank, a digital bank leader in the Philippines! This partnership aims to close the financial gap for Filipinos by channeling PHP 2.75 billion through digital platforms for better credit access.

Lucena Villagers Gets Clean Water Supply From PHP20 Million Solar Projects

0

Lucena Villagers Gets Clean Water Supply From PHP20 Million Solar Projects

0

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Residents of three villages in this city will soon enjoy a steady potable water supply from solar-powered systems worth a total of PHP20 million to be put up by the office of Quezon Second District Representative David Suarez.

On Friday, Suarez, together with local officials, broke ground for the projects on separate occasions in the three villages.

Josefina Dalangin, city coordinator and acting team leader of the 150-household community in Sitio Kurba, Barangay Ibabang Iyam, said in an interview that the project will not only benefit the residents in their area in terms of drinking water but also in irrigating their rice fields.

The Level II Public Water Supply System, with a PHP5-million fund, will be capable of producing 13,000 liters of water every day, enough for 500 households, said Engr. John Ceedee Alvarez, Engineer II at the Department of Public Works and Highways-Quezon II District Engineering Office (DPWH-Quezon II DEO).

As Sitio Kurba only has 150 households, the rest of the water from the water supply system can be used to irrigate the 20-hectare rice fields of the community, he added.

“The project will be up for bid in April and probably will begin construction in June. The timeline is 180 days so by September, this sitio (sub-village) can enjoy clean and potable water,” said Alvarez in a separate interview.

The parcel of land where the mechanism and water tank are located in Barangay Ibabang Iyam is donated by the family of Pedrito Sedaria.

Meanwhile, the water system project in Purok Anak Bagong Sinag Phase 2 in Barangay Cotta is also worth PHP5 million and will benefit 500 households.

The other one located in Purok Sta. Teresa, Barangay Dalahican will cost PHP10 million and is set to benefit 900 households.

In his speech at the events, Suarez emphasized to the residents the importance of clean and safe water, which, he said, prompted him to act immediately as soon as he received the request for the projects. (PNA)