Vivant Reports 1H2026 Core Net Income Of PHP784 Million As Power Generation Remains The Largest Contributor While Share Of Water Business Grows

Vivant Corporation posted PHP784 million in core net income for the first half of 2026, with power generation remaining its largest earnings contributor.

Pag-IBIG Fund Net Income Up 24% To PHP41.35 Billion In First Half Of 2026

Pag-IBIG Fund posts record first-half net income of PHP41.35 billion, reflecting stronger earnings and disciplined cost management.

Borromeo Motoring Group Signs New RES Deal For 20 Luzon Dealerships

Borromeo Motoring Group taps COREnergy to manage power more strategically across 20 Luzon dealerships and automotive facilities.

Two Founders, One Purpose: How Joel Cabugos And Jax Reyes Built KasKasan Buddies

KasKasan Buddies grew from the complementary strengths of Joel Cabugos and Jax Reyes, whose shared vision placed financial education and community value at the center.

Legazpi City Villagers Benefit From AKB’s Water Project

The Ako Bicol Party-list’s initiative transforms the lives of Barangay Buenavista residents in Legazpi City with enhanced access to clean water.

Legazpi City Villagers Benefit From AKB’s Water Project

2,373
2,373

How do you feel about this story?

Express Your Reaction
Like
Love
Haha
Wow
Sad
Angry

Residents of Barangay Buenavista here are now benefiting from a water project initiated by the Ako Bicol Party-list.

Barangay Captain Rogelio Leron said that over 367 households, or 1,600 individuals, have been able to access clean water from the facility.

“This has greatly improved the daily lives of the residents, as they now have easy access to water for cooking, laundry, bathing, and other daily activities,” Leron said in Filipino in an interview on Monday.

Shienalyn Navarro, a 33-year-old mother of four, expressed her gratitude for the project, saying it has saved her time and effort, especially as a vendor who needs water to clean her products.

“We also had water before, but we needed to walk and fetch water,” she said, adding that during rainy days, the water became murky and unfit for use.

“With this project, there is now water in every house. For us, it’s very helpful, for me, who has four children. It saved me a lot of time. Thank you, AKB, especially to former rep. Christopher Co,” Navarro said.

Former AKB representative Christopher Co, who initiated the project, visited the water collector and filtration area of the water system on Monday.

He expressed plans to open the water system to residents from other villages and eventually to the entire city.

Co emphasized the safety and continuity of the water source, even during typhoons and power outages.

“The water source is very safe from waste. Even if there is a typhoon, there is a brownout, there is water. With these, it can help and provide a solution to the long-time water problem of the city. People were sleeping from 10 p.m. to 5 a.m.; water continues from that time; with that, we need to collect all the water and the people of Legazpi can use it,” he said.

He also mentioned that the project was funded with a significant amount for the construction of water collectors and filtration during his time as AKB representative.

Co said there is a need for additional pipelines, water filtration, and reservoirs to ensure the expansion of the project.

He believes that this project can provide a long-term solution to the city’s water problem, benefiting all the residents. (PNA)