PAGEONE Group’s PR Institute Hosts Non-Profit Blogging Workshop: “Narratives Of Change”

PAGEONE Group's PR Institute recently held an inspiring workshop called “Narratives of Change,” led by Deivid Guian Rioferio. This event focused on empowering non-profit bloggers and writers to craft compelling stories that elevate their causes.

I Am MAD Conducts Last “MAD Talks Padayon”, Highlighting Mental Health And Volunteerism

I Am MAD wrapped up its final “MAD Talks Padayon” event, focusing on the importance of mental health. Volunteers and participants united to share their stories and support one another.

Iba Rotary Club, Wyeth Nutrition’s Ascenda Kid, Tackle Child Stunting

The Iba Rotary Club, in collaboration with Wyeth Nutrition Philippines, has launched a Pre-School Readiness Program aimed at combating malnutrition among preschoolers in Iba, Zambales. The event attracted 185 children and their 171 parents and caregivers.

Why PHINMA Properties Is A Developer For Good

PHINMA Properties has spent over thirty years showcasing the essence of Filipino culture and quality through its diverse projects nationwide, emphasizing their mission to enhance lives.

Leyte Irrigation Project Set To Launch In 2025 With PHP1 Billion Investment

87

Leyte Irrigation Project Set To Launch In 2025 With PHP1 Billion Investment

87

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The PHP1-billion Hibulangan Small Reservoir Irrigation Project in Villaba, Leyte will be operational in 2025 after more than a decade of construction, the National Irrigation Administration (NIA) said Tuesday.

NIA Leyte and Biliran irrigation management office manager Conrado Samson said during the Kapihan sa Bagong Pilipinas press briefing they are on the final stages of the project before its inauguration next year.

“We are waiting for good weather and clearance for plugging. We are also preparing our farmers for the full operation of the project,” Samson said.

Plugging reduces the water-holding capacity and drainage rate of soil.

He admitted that unfavorable weather in most times of the year caused the delay of the project that started in 2013.

Also contributing to the delay was the unavailability of funds, disruption caused by Super Typhoon Yolanda and the Covid-19 pandemic movement restrictions.

The project involved the construction of a 35.5-meter earth-filled dam with storage capacity of about 10.8 million cubic meters of water.

It is designed to irrigate the 2,750 hectares of rice farms in the towns of Villaba, Matagob and Matalom, which are known as the rice-producing areas in Leyte.

The reservoir is located in Sulpa village in Villaba town. A network of irrigation canals will carry water to farmlands in Hibulangan, Bugabuga, Tumamak, Sta. Cruz and Capinahan villages, all in Villaba town. Service roads were built on the banks of the canals.

The project was also one of the priority irrigation projects under the Regional Development Plan that was deemed vital to the region’s economic expansion. (PNA)