New Voith MegaDrive Rubber Wire Drive Roll Improves Traction And Ex-tends Runtimes

Voith has introduced MegaDrive, a next-generation rubber wire drive roll cover designed to deliver lasting traction and reduce maintenance in paper production.

The Mayora Who Built A Barangay Before She Had A Blueprint

Frances Cabatuando transformed a simple need for home inspiration into Home Buddies, an online community where millions of Filipinos now share practical advice.

Oman–Philippines 3: Strategic Majlis Opens In Manila To Build On Decades Of Migration Ties Through Trade And Investment

Oman and the Philippines are building on people-to-people connections to strengthen cooperation in investment, commerce, and shared growth.

A Winning Journey: From HONOR 600 To Mercedes-Benz EQA

HONOR Philippines turns a promo journey into a winning moment as one fan drives home a brand-new Mercedes-Benz EQA.

New Bacolod City Hall To Be Completed In 18 Months

Bacolod City is investing in its future with a new City Hall project costing PHP223 million, expected to be completed in 18 months.

New Bacolod City Hall To Be Completed In 18 Months

1,638
1,638

How do you feel about this story?

Express Your Reaction
Like
Love
Haha
Wow
Sad
Angry

The construction of the new Bacolod City Hall, with an initial project cost of almost PHP223 million, is expected to be completed in 18 months.

On Tuesday, Mayor Alfredo Abelardo Benitez led the groundbreaking ceremony on the original historical site of the building on Luzuriaga and Araneta Streets in the downtown area.

“The original appropriation is about PHP220 million, but I think we would run short with the design just to make it a legacy and iconic building. So, it’s short by about PHP80 (million) to PHP100 million,” Benitez said.

He added that the City Engineer’s Office is still determining the additional amount needed to finish the rehabilitation/improvement project funded under the PHP4.4 billion loan package of the city government from the Development Bank of the Philippines.

“This, being a legacy project, at this particular moment, we are looking at what represents Bacolod. It will have a 10x10x4-meter artwork. We will engage a group of local artists to paint it,” Benitez said.

He added that the mural would serve as a walk-through of the history of Bacolod or an art piece about Bacolod.

Benitez said the old structure was built 61 years ago, and on the same site, a modern city hall with bigger and newer offices would rise to better serve the Bacolodnons.

The new four-story structure, which will have a 55-vehicle parking lot, will house the offices of the City Disaster Risk Reduction Office, City Veterinary Office, General Services Office, Persons with Disability Office, Office of the Senior Citizens Affairs, Commission on Audit, and Department of the Interior and Local Government.

It will still include a space for the City Mayor’s Office to symbolize the City Hall as the seat of the city government, Benitez said.

The City Mayor’s Office and City Council offices are currently holding operations at the Bacolod City Government Center, built in 2007.

The site of the old City Hall, along with the Fountain of Justice, was originally occupied by the residence of Don Jose Ruiz de Luzuriaga.

It first became the seat of the provincial government and then the Bacolod City Hall. (PNA)