How HONOR Magic6 Pro’s AI Features Drive The Smartphone Brand To Be No. 1 In China

HONOR clinches the top spot among smartphone brands in IDC’s latest study, with a notable 17% share and a phenomenal 123.3% Year-over-Year shipments surge in Q1, 2024.

Limited Time Offer: Save PHP1,000 On HONOR 90 Lite 5G + Free Bluetooth Speaker!

The HONOR 90 Lite 5G is now available at a discounted price – it's the perfect time to upgrade your phone!

Elevate AIDA: Empowering Women With Digital Skills Training

Elevate AIDA, Aboitiz, and Connected Women are teaming up to empower women through tools and training for meaningful employment.

The World’s No. 1 AI Camera Phone: HONOR Magic6 Pro Is Confirmed To Arrive In PH!

Experience magic this May with the multi-awarded HONOR Magic6 Pro, an AI camera phone with 5 DXOMARK Top 1 Labels!

TPLEX Extension To Boost Growth In Northern Luzon

24

TPLEX Extension To Boost Growth In Northern Luzon

24

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The approval of the PHP23.4-billion 59.4-kilometer Tarlac-Pangasinan-La Union Expressway (TPLEX) extension project will further spur economic development in Northern Luzon, the Department of Finance (DOF) said.

“The TPLEX Extension Project’s swift approval demonstrates the President Ferdinand R. Marcos Jr. administration’s resolve to cut bureaucratic red tape and streamline government processes. This is critical to accelerating much-needed investments in infrastructure,” Finance Secretary Benjamin Diokno said in a statement over the weekend.

The National Economic and Development Authority (NEDA) Board chaired by President Marcos approved on Friday the TPLEX extension project.

The evaluation and approval process for the project is the fastest recorded for a public-private partnership (PPP) proposal.

The proposal was submitted to the Investment Coordination Committee on March 23 and subsequently elevated to the NEDA Board.

The NEDA Board gave the Department of Public Works and Highways permission to commence negotiations with the project’s original proponent.

To ensure a thorough and fair evaluation process, the DOF introduced provisions to the parameters, terms, and conditions to limit government contingent liabilities in case of concessionaire default.

The TPLEX extension project is expected to cut the travel time from Rosario to San Juan, La Union province from 96 minutes to 42 minutes.

The first segment spanning Rosario to Tubao is estimated to be operational by 2026, while the entire project is to be completed by 2028.

“The government is committed to strengthening and facilitating PPPs. This requires a well-functioning and responsive policy framework, underpinned by transparency and accountability,” Diokno said.

The 89.31-kilometer TPLEX that spans Tarlac City, Tarlac to Rosario, La Union was completed in 2020. (PNA)