How HONOR Magic6 Pro’s AI Features Drive The Smartphone Brand To Be No. 1 In China

HONOR clinches the top spot among smartphone brands in IDC’s latest study, with a notable 17% share and a phenomenal 123.3% Year-over-Year shipments surge in Q1, 2024.

Limited Time Offer: Save PHP1,000 On HONOR 90 Lite 5G + Free Bluetooth Speaker!

The HONOR 90 Lite 5G is now available at a discounted price – it's the perfect time to upgrade your phone!

Elevate AIDA: Empowering Women With Digital Skills Training

Elevate AIDA, Aboitiz, and Connected Women are teaming up to empower women through tools and training for meaningful employment.

The World’s No. 1 AI Camera Phone: HONOR Magic6 Pro Is Confirmed To Arrive In PH!

Experience magic this May with the multi-awarded HONOR Magic6 Pro, an AI camera phone with 5 DXOMARK Top 1 Labels!

DOTr: Transport Issues, Not Crisis

3

DOTr: Transport Issues, Not Crisis

3

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Transportation (DOTr) maintained that there is no transportation crisis in the country but there are transport issues that are being addressed by the administration of President Rodrigo Duterte.

In a media statement on Wednesday, Secretary Arthur Tugade said “there is no transportation crisis. There are transportation issues and problems.”

In response to criticisms that the country faces a “mass transport crisis” due to recent problems in the Light Rail Transit Line 2 (LRT-2), the DOTr said the Philippines is 20 years behind in terms of transport infrastructure.

“This is precisely the reason why since the beginning, the DOTr, under the Duterte administration, has been employing a catch-up plan to expedite the construction and operationalization of various transport infrastructure projects,” a DOTr statement read on Tuesday.

The infrastructure projects under construction are the Metro Manila Subway, Metro Rail Transit Line 7 (MRT-7), Light Rail Transit Line 1 (LRT-1) Cavite Extension, LRT-2 East Extension, Philippine National Railways (PNR) Clark Phase 1, Common Station, PNR Calamba, PNR Bicol, LRT-2 West Extension, Subic-Clark Railway, and the Mindanao Railway.

The DOTr said it has so far completed 64 airport projects nationwide with 133 more ongoing, one land port built and in operation, and completed 222 commercial and tourism port projects with another 122 underway.

The department said improvements in transportation will be gradually experienced as the government addresses the 20-year infrastructure backlog.

Last Oct. 3, tripped power transformers ignited a fire in the LRT-2, resulting in a four-day suspension of the entire rail line and a 9-month suspension of service of the Anonas, Katipunan, and Santolan stations. (PNA)