Long Before Simpol, Cooking Was Already Personal

At the heart of it, Chef Tatung’s approach reminds people that cooking is a human experience shaped by stories, relationships, and the simple act of caring.

The Birth Of The KitchiZen: Slow Fire, Steady Heart In A World Of Too Much

With KitchiZen, Chef Tatung invites reflection on how simple acts, repeated over time, can shape a more balanced and grounded way of living.

Taiwan Taps Filipino Talent For Global Semiconductor Workforce At 2026 Career Day

Taiwan brings semiconductor career opportunities to Manila, connecting Filipino engineers with global industry leaders as demand for skilled talent continues to rise.

When Publicity Stopped Being Proof Of Reputation Strength

Modern reputation management requires more than visibility, as stakeholders now rely on evidence from actions, culture, and engagement rather than curated public communications.

Leyte Coop To Put Up More Substations As Power Demand Grows

An electric company in Leyte builds new substations to meet growing demand, ensuring uninterrupted electricity for booming businesses.


Leyte Coop To Put Up More Substations As Power Demand Grows

57
57

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

An electric cooperative in Leyte is building more substations amid growing power demand in the central part of the province.

Allan Laniba, general manager of Don Orestes Romualdez Electric Cooperative (Dorelco), said in an interview Monday that the construction of a 10 MVA (MegaVolt Ampere) substation in Abuyog town is now ongoing to help ensure power stability in the area.

Recently, Dorelco completed the 5 MVA substation in Tanauan town to serve power consumers of Tanauan and Dagami towns.

Two years ago, the power cooperative completed the 5MVA substation in Mayorga town covering the towns of Lapaz, Mayorga, Macarthur, and Javier.

The 5 MVA Javier substation which has been operating for decades, distributes power to Abuyog and Mahaplag towns.

The 10 MVA substation at Dorelco’s office compound in Tolosa town brings electricity to the towns of Tolosa, Tabontabon, Burauen, Julita, and Dulag.

Laniba said that to reduce the load of Tolosa substation, the power cooperative plans to build substations in Dulag and Burauen towns.

A substation is a high-voltage electric system facility being used to switch generators, equipment, and circuits or lines in and out of a system.

The electric cooperative is investing a minimum of PHP32 million to build a substation.

“It’s like a heart of power distribution system. We need substations in these areas since businesses are booming. If an area is far from a substation, it can trigger brownouts due to low voltage,” Laniba added.

Dorelco was established on June 21, 1971, thru the declaration of Presidential Decree 269, as Leyte Electric Cooperative, Inc. (LECI) financed by a long-term loan of PHP28 million to the government through NEA by the United States Agency for International Development (USAID).

Its first franchise was approved in 1977.

The cooperative’s franchise area is 164,426 hectares bounded by the Pacific Ocean in the eastern part and the mountainous range of central Leyte area. As of June 2023, the cooperative distributes power to 103,107 consumers. (PNA)