9Lives And Vision Express Introduce A New Eyewear Collection With A Modern 90s Edge

The new 9Lives eyewear collection with Vision Express revisits 90s fashion through bold frames and modern design, blending nostalgia with a refined and contemporary edge.

Vivant Extends Aid To Black Saturday Fire Victims In Brgy. Ermita

Vivant Foundation extended support to families affected by the Black Saturday fire in Barangay Ermita, offering timely assistance as the community begins to recover.

Reputation Is Not Insurance. It Is Capital.

A loyal community formed through authenticity proved more resilient than institutions lacking genuine public connection when the situation escalated.

Long Before Simpol, Cooking Was Already Personal

At the heart of it, Chef Tatung’s approach reminds people that cooking is a human experience shaped by stories, relationships, and the simple act of caring.

First Gen Renews Power Deal With Murata For 100% Renewable Energy Supply

First Gen Corp. renews its power deal with Murata to run its Batangas plant on 100% renewable energy.

First Gen Renews Power Deal With Murata For 100% Renewable Energy Supply

606
606

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Lopez-led First Gen Corp. has renewed its power supply agreement with Japanese electronics manufacturer Murata to energize its Batangas plant with 100-percent renewable energy.

In a statement Tuesday, First Gen said its subsidiary Energy Development Corp. (EDC), which operates the Bacon-Manito geothermal facility in Bicol, will supply clean energy to Murata’s unit here, Philippine Manufacturing Co. of Murata, Inc. (PMM).

Supplying PMM’s factory from Bacon-Manito geothermal plant is aligned with Murata’s shift to 100 percent RE in all its offices and facilities across the globe by 2050.

PMM’s manufacturing inside the First Philippine Industrial Park (FPIP) economic zone in Batangas, which is also operated by the Lopezes, is Murata’s first overseas facility that runs on full RE since 2022.

“Together, we in First Gen and PMM are not just reducing emissions but also shaping a future where environmental responsibility and growth go hand in hand,” First Gen president and chief operating officer Francis Giles Puno said.

The initial power supply deal between First Gen and PMM was in 2021.

“This extended collaboration not only strengthens our bond but also reinforces our shared dedication to environmental stewardship,” Puno said.

“The renewal of our supply agreement with First Gen highlights our companies’ decarbonization and sustainability goals. While we aim to capture the demand for components that support emerging technologies, we want to do so in a manner that is cost-efficient, best in class, and carbon-neutral,” PMM president Masayoshi Koda added.

Aside from utilizing geothermal energy, PMM has installed more than 6,700 solar panels in its facility to generate nearly 3,000 kilowatts of electricity from solar power.

On Monday, Philippine Economic Zone Authority (PEZA) Director General Tereso Panga said more ecozone locators are demanding for green and sustainable initiatives in industrial parks.

Panga said an “eco-industrial park,” or EIP, is the new standard for PEZA zones.

Big ecozone developers like FPIP are embarking on EIPs, he added. (PNA)