Vivant Posts 42% Rise In Core Net Income To PHP318M In 1Q2025 On Strong Power, DU Gains

Consolidated Core Net Income (CCNI) grew by 42% to Php 318 mn; accounting for non-recurring income, Net Income Attributable to Equity Holders of the Parent recorded at Php 284 bn, 26% higher than the level in 1Q 2024.

AXE Shows A Sweeter Side To Guys With Its Two New Scents

AXE is making waves with two new scents that embrace a sweeter version of masculinity.

Celebrate Her Strength And Style With The Barbie™ And G-SHOCK Collaboration

Celebrate the unstoppable spirit of mothers with the stylish Barbie™ x G-SHOCK collaboration.

Timeless Gifts For Mother’s Day: Watches That Celebrate Every Moment With Mom

This Mother’s Day, a timeless watch encapsulates the beauty of your relationship and the moments that matter most.

DPWH-5 Completes PHP190 Million Flood Structures In Camarines Sur

A government agency disclosed that new flood mitigation structures are now finished in Camarines Sur to help residents during catastrophes.

DPWH-5 Completes PHP190 Million Flood Structures In Camarines Sur

87
87

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Public Works and Highways in Bicol (DPWH-5) has completed the construction of two flood mitigation structures worth PHP190 million in Nabua, Camarines Sur.

In a statement on Tuesday, DPWH Regional Director Virgilio Eduarte said the structures — the PHP93-million dike in Barangay Antipolo Young and another dike worth PHP97 million in Barangay San Jose — were built for the preservation of lives and properties particularly in areas near the rivers.

“It will also decrease the destruction in agricultural livelihood, reduction of bank collapse and harmful degradation of the riverbed, and roads will be passable even during adverse weather conditions because overflow from the river will be minimized,” Eduarte said.

The two completed projects are interconnected, he said in a follow-up interview.

“The Bicol River crosses the central part of Nabua, making it inevitable for the municipality to become the catch basin for water runoffs during typhoons and heavy rainfall since most of its barangays including the Poblacion are in low-lying areas,” Eduarte noted.

It can be recalled that DPWH also installed a 2,542-lane meter flood control structure in Waras River, also in Nabua, in 2019.

“Substantial investments are being made by the government for long-term flood protection strategies. A number of projects not only in Camarines Sur but all over the country have been funded for the past years to save lives and properties,” Eduarte said. (PNA)