Vivant Energy Secures 15-Year PSA To Meet Siquijor’s Growing Power Demand

Vivant Energy secured a 15-year power supply agreement to support Siquijor’s growing electricity demand amid rising tourism and economic activity.

How Tarantadong Kalbo Built Power Through Simplicity

Kevin Eric Raymundo reflects on how Tarantadong Kalbo began as a joke and gradually evolved into a platform for thoughtful social commentary grounded in honesty and restraint. #PAGEONESpotlight_KevinEricRaymundo #PAGEONESpotlight_TarantadongKalbo

Chef Tatung Accidentally Boiled A Smartphone On Live Video—The Phone Survived

Chef Tatung was calmly cooking when a phone slipped into a boiling pot and somehow survived everything after. #PAGEONExHONOR #HONORX9d5G #TheToughestPhone #AllAngleUltraDefense

STI Talent Search 2025 Takes On A New Stage With New Class Of Talents

STI College celebrated the grand finale of its annual STI Talent Search last November 21, drawing exceptional participants from different campuses and clusters nationwide. STIers, teachers, and guests from its 63 campuses nationwide all came to witness and cheer on their top student performers, this time, at a brand-new stage in Pampanga’s latest attraction, Pradera […]

DOTr: Transport Issues, Not Crisis

DOTr: Transport Issues, Not Crisis

42
42

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Transportation (DOTr) maintained that there is no transportation crisis in the country but there are transport issues that are being addressed by the administration of President Rodrigo Duterte.

In a media statement on Wednesday, Secretary Arthur Tugade said “there is no transportation crisis. There are transportation issues and problems.”

In response to criticisms that the country faces a “mass transport crisis” due to recent problems in the Light Rail Transit Line 2 (LRT-2), the DOTr said the Philippines is 20 years behind in terms of transport infrastructure.

“This is precisely the reason why since the beginning, the DOTr, under the Duterte administration, has been employing a catch-up plan to expedite the construction and operationalization of various transport infrastructure projects,” a DOTr statement read on Tuesday.

The infrastructure projects under construction are the Metro Manila Subway, Metro Rail Transit Line 7 (MRT-7), Light Rail Transit Line 1 (LRT-1) Cavite Extension, LRT-2 East Extension, Philippine National Railways (PNR) Clark Phase 1, Common Station, PNR Calamba, PNR Bicol, LRT-2 West Extension, Subic-Clark Railway, and the Mindanao Railway.

The DOTr said it has so far completed 64 airport projects nationwide with 133 more ongoing, one land port built and in operation, and completed 222 commercial and tourism port projects with another 122 underway.

The department said improvements in transportation will be gradually experienced as the government addresses the 20-year infrastructure backlog.

Last Oct. 3, tripped power transformers ignited a fire in the LRT-2, resulting in a four-day suspension of the entire rail line and a 9-month suspension of service of the Anonas, Katipunan, and Santolan stations. (PNA)