MCWD Boosts Water Supply With Vivant Desal Plant Partnership

MCWD’s partnership with Vivant Water helps strengthen Cebu’s water supply through desalinated water from the IMCC plant.

Atasha Muhlach Is Annie Batungbakal In Bongga Ka, ‘Day!: The Annie Batungbakal Musical

Atasha Muhlach steps into the spotlight as Annie Batungbakal, bringing fresh energy to Bongga Ka, ‘Day!: The Annie Batungbakal Musical.

MGEN Builds A Workplace Where Everyone Belongs

MGEN’s DEIB commitment reflects a workplace vision where belonging becomes part of how people work, grow, and contribute.

UP CMC Demands Answers On Missing PHP4.4 Million

College seeks records, reconciliations, and supporting documents after foundation discloses fund losses.

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

The Department of Energy disclosed that there is nothing to worry about the fuel supply amid the forced outages of generating plants in Luzon.

DOE Assures No Constraint Of Fuel Supply Despite Power Plant Outrage

123
123

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Energy Secretary Raphael P.M. Lotilla assured the public that there is no fuel supply constraint after some power generating plants servicing the Luzon Grid went on simultaneous forced outages this morning.

“We assure the public that the DoE is verifying the cause of the forced outages this morning as there appears to be no fuel supply constraints. A team from the DOE will conduct actual physical spot checks and validate the condition of the transmission lines and the affected power plants,” the Secretary said.

Luzon Grid is on red alert for interval hours from 1:00 – 6:00 PM today and on the yellow alert status on interval hours from 10 AM – 1:00 PM and 5:00 PM – 9:00 PM tonight, according to the grid operator.

When reserves fall below ideal levels, a yellow alert is placed over the grid. When supply-demand balance worsens, a red alert, which points to severe power deficiency that may lead to rotating power interruptions, is declared.

Meanwhile, DoE was informed by the Manila Electric Company (Meralco) that it has advised its Interruptible Load Program (ILP) participants of possible manual load dropping. The ILP participants may run their facilities to allow more grid capacity to serve other customers.