Vivant Energy Secures 15-Year PSA To Meet Siquijor’s Growing Power Demand

Vivant Energy secured a 15-year power supply agreement to support Siquijor’s growing electricity demand amid rising tourism and economic activity.

How Tarantadong Kalbo Built Power Through Simplicity

Kevin Eric Raymundo reflects on how Tarantadong Kalbo began as a joke and gradually evolved into a platform for thoughtful social commentary grounded in honesty and restraint. #PAGEONESpotlight_KevinEricRaymundo #PAGEONESpotlight_TarantadongKalbo

Chef Tatung Accidentally Boiled A Smartphone On Live Video—The Phone Survived

Chef Tatung was calmly cooking when a phone slipped into a boiling pot and somehow survived everything after. #PAGEONExHONOR #HONORX9d5G #TheToughestPhone #AllAngleUltraDefense

STI Talent Search 2025 Takes On A New Stage With New Class Of Talents

STI College celebrated the grand finale of its annual STI Talent Search last November 21, drawing exceptional participants from different campuses and clusters nationwide. STIers, teachers, and guests from its 63 campuses nationwide all came to witness and cheer on their top student performers, this time, at a brand-new stage in Pampanga’s latest attraction, Pradera […]

DepEd: No Delay In School Reopening Even In Quake-Hit Areas

The Department of Education said the reopening of classes will push through, even in earthquake-affected areas in Luzon.

DepEd: No Delay In School Reopening Even In Quake-Hit Areas

45
45

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Department of Education (DepEd) on Monday said the reopening of classes will push through on August 22, even in northern Luzon areas, including Abra province, which was hit by a magnitude 7 earthquake on July 27.

“The direction is that there will be no delay in the opening of classes. Just alternative delivery mode for certain areas,” said DepEd spokesperson Michael Poa in a Viber message to reporters.

Poa made the statement following the DepEd’s assessment of the situation and capabilities of the quake-damaged schools to reopen classes.

He, however, clarified the decision was only for the August 22 opening of classes since 451 classrooms were destroyed by the Luzon quake.

“Right now, the discussion on this was confined to the August 22 opening of classes. We will monitor the situation thereafter. The thrust is to still implement full in-person classes starting Nov 2,” he said.

During the kickoff event of Brigada Eskwela at the Imus Pilot Elementary School in Imus, Cavite on Monday, Vice President and Education Secretary Sara Duterte said the DepEd is looking into a PHP1.4-billion worth of recovery and reconstruction fund.

“Hindi pa nga natin naayos at natapos ang destruction ng isang kalamidad, dumating na naman ang isang kalamidad (We haven’t yet recovered from destruction of a calamity, yet another calamity came). And we need more than PHP18 billion, excluding the PHP1.4 billion of damage from the Abra earthquake to get ourselves out of the quicksand of this year and last year. It does not include the things, or the repairs that we have to do from 2016,” Duterte said in her speech.

Poa, however, said the amount is not yet final since the department is still planning to request additional funding from the Department of Budget and Management (DBM).

“We’re really assessing the situation on the ground, and we’re looking at options, and one is the temporary learning spaces which we can build, so of course, that would also entail funding and will depend on how many were destroyed, because every day the amount changes,” he said.

Poa said DepEd is considering building “temporary learning spaces” in areas severely affected by the Abra earthquake.

Earlier, the DepEd said it will propose a PHP4-billion worth of Quick Response Fund to ensure speedy recovery and reconstruction whenever calamity arises. (PNA)