BISELCO Awards 15-Year Power Supply Deal To CIPC To Strengthen Palawan’s Energy Security

BISELCO has awarded a 15-year power supply deal to CIPC, aimed at enhancing Palawan’s energy security.

Vivant Hits Record PHP2.3 Billion Core Net Income In 2024 Amid Strong Growth

Vivant Corporation reports a remarkable 20% increase in consolidated core net income for 2024, reaching Php 2.3 billion.

ASUS Zenbook A14: The Lightest Zenbook AI Laptop Is In The Philippines

The Zenbook A14 is setting new standards in the world of lightweight laptops with its remarkable design. #PAGEONExASUS

GALLANT: Inspiring Local Champions, Awakening Global Potential

GALLANT is here to inspire local champions and awaken global potential. The time to step up is now.

Farmers In Davao Del Sur Town Set To Benefit From PHP200 Million Irrigation Dam

The National Irrigation Administration offered a new irrigation dam in the Davao region, providing sufficient water supply to the rice fields.

Farmers In Davao Del Sur Town Set To Benefit From PHP200 Million Irrigation Dam

36
36

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Irrigation Administration (NIA) has turned over a rehabilitated irrigation system to Davao del Sur’s town of Hagonoy to supply water to the rice fields of some 2,249 farmer-beneficiaries, an official said Friday.

NIA acting administrator Engr. Eddie Guillen led Thursday the inauguration of the PHP202 million revitalized Padada River System (RIS), the oldest national irrigation dam in the Davao region.

“It is fully operational and ready to fully serve the farmer-beneficiaries,” Guillen said in a statement.

The dam’s repair began in Sept. 2021 and was completed on Jan. 16 this year.

Guillen said the RIS was made ready for automation, and more mitigating measures are set in place to ensure the integrity of its stability.

The dam will serve an area of 3,512 hectares planted with rice and banana.

Allan Abillion, president of the Padada RIS Federation of Irrigators Association, lauded NIA and the local government for the realization of the project.

He recalled that the dam was built in 1953 and became operational in 1956. Over the past several years, the dam has degraded, resulting in calls for its rehabilitation.

Between 2019 and 2020, extreme weather conditions and natural calamities further compromised the integrity of the main dam and other structures.

Two strong 6.3 and 6.9 magnitude quakes, heavy downpours, and decades of quarrying activities near the dam site also took their toll on the structure, leaving it severely damaged and in a critical state. (PNA)