Taiwan Taps Filipino Talent For Global Semiconductor Workforce At 2026 Career Day

Taiwan brings semiconductor career opportunities to Manila, connecting Filipino engineers with global industry leaders as demand for skilled talent continues to rise.

When Publicity Stopped Being Proof Of Reputation Strength

Modern reputation management requires more than visibility, as stakeholders now rely on evidence from actions, culture, and engagement rather than curated public communications.

Chef Tatung Sarthou Introduces A Filipino Philosophy Of Living Through The Wisdom Of The Kitchen

Chef Tatung Sarthou introduces KitchiZen, a book that reframes the Filipino kitchen as a space for life lessons on balance, patience, and understanding enough.

From Narrative To Infrastructure: How Reputation Management Evolved In The Last 10 Years

Reputation today is no longer shaped by messaging alone but by systems, actions, and consistency that stakeholders experience and verify across platforms over time.

NHA Allocates P20-M For Zambo Footbridge Project

NHA Allocates P20-M For Zambo Footbridge Project

39
39

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Housing Authority (NHA) has allocated PHP20 million to build a concrete footbridge for those living in houses on stilts in one of the siege-affected barangays.

The recipient of the concrete footbridge project is Barangay Rio Hondo, one of the five most-affected barangays in the 2013 Zamboanga siege.

Rodrigo Pagotaisidro, City Housing and Land Management Division chief, said Saturday they are just waiting for the NHA to download the funds to the City Engineer’s Office, which is in charge of the implementation of the project.

The concrete footbridge will replace the existing wooden footbridge leading to the houses on stilts in Barangay Rio Hondo.

Pagotaisidro said the construction of a concrete footbridge is imperative to avert a repeat of an accident wherein government and NHA officials fell into the murky water as the wooden bridge collapsed.

The officials, Mayor Maria Isabelle Climaco-Salazar, then 1st district Congressman Celso Lobregat, Negros Occidental Congressman Alfredo Benitez, NHA and other officials were conducting an inspection on April 26, 2018, when the wooden footbridge collapsed.

Pagotaisidro said the City Engineer’s Office will start the work once the NHA will release the PHP20 million allocation.

Meanwhile, he said the wooden footbridge will be rehabilitated by the City Engineer’s Office while awaiting the release of the funds. (PNA)